Claims: I claim:

1. A method of well treatment by hydraulic fracturing of the formation to be treated, said fracturing including at least one double cycle comprising injection of fluid into the formation for a period of at least three minutes under pressure throughout said period sufficient to fracture the formation; planned discontinuance of said fluid injection and at least one period of reverse flow of said fluid from said formation for a period of time at least long enough to allow a significant pressure drop in said fluid, resumption of injection, and discontinuance of injection.

2. Method according to 1 including two double cycles.

3. Method according to 1 including three double cycles.

4. Method according to 1 including a plurality of double cycles.

5. Method according to 1 incuding injecting fine sand with the fracturing fluid to limit the vertical conductive extent of the fracturing.

6. Method according to 1 including injecting fine sand for fluid loss control.

7. Method according to claim 1 wherein said period of reverse flow is sufficient to return .25 to 1.00 percent by volume, of the fluid injected into the formation.

8. Method according to claim 1 where said period of reverse flow is sufficient to allow flow back of more than five and less than 50 barrels of said fluid.

9. Method according to claim 1 wherein said period of reverse flow is greater than 20 seconds and less than 10 minutes.

10. Method according to claim 1 wherein said period of reverse flow is sufficient to allow flow back of less than all recoverable fracturing fluid.

11. Method according to claim 1 wherein said fluid is substantially incompressible.

12. Method according to claim 1 wherein said fluid is gas free at formation and surface ambiant conditions.

13. Method according to claim 1 wherein said fluid is injected into the formation for at least several minutes.

14. A method of well treatment by hydraulic fracturing of the formation to be treated, said fracturing including a plurality of double cycles each of which double cycle comprises:

injecting fracturing fluid into the formation at a pressure sufficient to fracture the formation, maintaining said pressure for at least three minutes, discontinuing injecting fracturing fluid into the formation, allowing at least one period of reverse flow from said formation for a period of time at least long enough to allow a significant pressure drop in said fluid, and again injecting fracturing fluid into the formation.

15. Method according to 14 wherein the number of double cycles is two.

16. Method according to 14 wherein the number of double cycles is three.

17. Method according to 14 wherein the well is not produced between double cycles.

18. Method according to 14 wherein each period of said discontinuing injecting fracturing fluid, except the last such period, lasts for from 5 minutes to one hour.

19. Method according to 14 wherein the injection pressure during each double cycle subsequent to the first double cycle is significantly greater than during the first double cycle, i.e. is at least 10 percent greater.

20. Method according to 14 wherein the period of the even numbered injection is of the order 1/4 to 1/3 the period of the immediately preceding odd numbered injection, considering that the several injections are numbered consequently in chronological order.

21. Method of 14 wherein the periods of the several consecutive pairs of injection periods, considering the first and second injection periods as the first such pair are approximately proportional to the square root of the number of such pair, considering that the several pairs are numbered consecutively in chronological order.

22. Method according to 14 wherein the periods of discontinuance of injection and reverse flow, other than the last one, are such that the shut in pressure does not fall to less than 1/3 of the amount of the increase in pressure during the previous injection, thereby to avoid excessive fluid loss.

23. Method according to 14 wherein the fracturing fluid is of the formation pressure increasing type, i.e., if injection were at constant rate, the injection pressure measured at the well head initially increases.

24. Method according to claim 14 wherein said period of reverse flow is sufficient to return .25 to 1.00 percent, by volume, of said fluid injected into the formation.

25. Method according to claim 14 wherein said period of reverse flow is sufficient to allow flow back of more than 5 and less than 50 barrels of said fluid.

26. Method according to claim 14 wherein said period of reverse flow is greater than 20 seconds and less than 10 minutes.

27. Method according to claim 14 wherein said period of reverse flow is sufficient to allow flow back of less than all recoverable fracturing fluid.

28. Method according to claim 14 wherein said fluid is substantially incompressable.

29. Method according to claim 14 wherein said fluid is gas free at formation and surface ambiant conditions.

30. Method according to claim 14 wherein said fluid is injected into the formation for at least several minutes.

31. Method of well treatment by hydraulic fracturing of the formation to be treated, said fracturing including at least one double cycle comprising

injection of fluid into the formation for a period of at least three minutes under pressure throughout said period sufficient to fracture the formation, said fluid being capable of undergoing fluid loss to said formation once said formation is fractured,

planned discontinuation of said fluid injection for a period of time at least long enough to allow a pressure reduction in said fluid,

resumption of injection with at least a portion of the formation exposed to fluid pressure during the first said injection being the same as a portion of the formation again exposed to fluid pressure during said resumed injection, and

discontinuance of injection.

32. Method according to claim 31 including two double cycles.

33. Method according to claim 31 including three double cycles.

34. Method according to claim 31 including a plurality of double cycles.

35. Method according to claim 31 including injecting fine sand with the fracturing fluid to limit the vertical conductive extent of the fracturing.

36. Method according to claim 31 including injecting fine sand for fluid loss control.

37. Method according to claim 31 wherein said injection into the formation of fluid under pressure sufficient to fracture the formation lasts from 3 minutes to one hour.

38. Method according to claim 37 wherein said planned discontinuance of such fluid injection lasts not more than 10 minutes.

39. Method of well treatment by hydraulic fracturing of the formation to be treated, said fracturing including a plurality of double cycles each of which double cycle comprises:

injecting fracturing fluid into the formation at a pressure sufficient to fracture the formation, said fluid being capable of undergoing fluid loss to said formation once said formation is fractured,

maintaining said pressure for at least three minutes,

discontinuing injecting fracturing fluid into the formation for a period of time at least long enough to allow a pressure reduction,

again injecting fracturing fluid into the formation with at least a portion of the formation exposed to fluid pressure during the first said injection being the same as a portion of the formation again exposed to fluid pressure during said resumed injection, and

again discontinuing injecting fracturing fluid into the formation.

40. Method according to claim 39 wherein the number of double cycles is two.

41. Method according to claim 39 wherein the number of double cycles is three.

42. Method according to claim 39 wherein the well is not produced between double cycles.

43. Method according to claim 39 wherein each period of said discontinuing injecting fracturing fluid, except the last such period, lasts for from 5 minutes to one hour.

44. Method according to claim 39 wherein the injection pressure during each double cycle subsequent to the first double cycle is significantly greater than during the first double cycle, i.e. is at least 10 percent greater.

45. Method according to claim 39 wherein the period of the even numbered injection is of the order 1/4 to 1/3 the period of the immediately preceding odd numbered injection, considering that the several injections are numbered consecutively in chronological order.

46. Method of claim 39 wherein the periods of the several consecutive pairs of injection periods, considering the first and second injection periods as the first such pair are approximately proportional to the square root of the number of such pair, considering that the several pairs are numbered consecutively in chronological order.

47. Method according to claim 39 wherein the periods of discontinuance of injection, other than the last one, are such that the shut in pressure does not fall to less than 1/3 of the amount of the increase in pressure during the previous injection, thereby to avoid excessive fluid loss.

48. Method according to claim 39 wherein the fracturing fluid is of the formation pressure increasing type, i.e., if injection were at constant rate, the injection pressure measured at the well head initially increases.

49. Method of well treatment by hydraulic fracturing of the formation to be treated, said fracturing including at least one double cycle comprising:

injecting into said formation a fluid capable of undergoing fluid loss to said formation once said formation is fractured,

continuing said injection for a period of at least three minutes.

at all times during said period maintaining said fluid under a pressure sufficient to fracture the formation.

then dropping the fluid pressure to give an opportunity for spalling to occur at the fracture faces,

resuming injection at a time beginning at least three minutes later than the first period of injection, and

discontinuing of said injection,

at least a portion of the formation exposed to fluid pressure during the first period of injection being the same as a portion of the formation exposed to fluid pressure during the second period of injection.

50. Method of well treatment by hydraulic fracturing of the formation to be treated, said fracturing including at least one double cycle comprising:

injecting into said formation a fluid capable of undergoing fluid loss to said formation once said formation is fractured,

continuing said injection for a period of at least three minutes,

at all times during said period maintaining said fluid under a pressure sufficient to fracture the formation,

discontinuing injection for a period of at least three minutes to give an opportunity for spalling to occur at the fracture faces,

resuming injection, and

discontinuing injection;

the same formation being treated during the entire treatment.
Descriptions:
Description: BACKGROUND OF THE INVENTION:

1. Field of the Invention:

This invention relates to hydraulic fracturing of earth formations, and more particularly to the hydraulic fracturing of HC (hydrocarbon) bearing formations, e.g. oil and gas sands, for the purpose of increasing the producing rate and total amount of recovery of the hydrocarbons from a well completed in such a formation, and, in the case of storage wells, for the purpose of increasing the injection rate and total capacity.

2. Brief Description of the Prior Art:

The hydraulic fracturing of HC formations is well known and is described for example in the following United States patents number:

3263751 - Kiel et al.

3376930 - Kiel et al.

3373815 - Kiel et al.

3378074 - Kiel

339727 - Graham & Kiel

3444889 - Kiel et al.

3497008 - Graham & Kiel

3553494 - Kiel

3601198 - Ahearn & Kiel

3664420 - Graham, Kiel & Terry

3695355 - Wood & Kiel

3700032 - Terry, Graham, Sinclair & Kiel

3722595 Kiel

And in the references cited against the above listed patents. Further description of the subject is to be found in an article entitled "Reservoirs in Fractured Rock" by Stearns and Friedman appearing at pages 82 et seq. of AAPG Memoir No. 16 Stratigraphic Oil & Gas Classification Methods and Case Histories - 1972 and the bibliography appended thereto.

The function of fracturing is to overcome the deficiency in permeability of the formation adjacent the well bore by creating a highly conductive path reaching out into the reservoir rock surrounding the well bore. According to the usual practice, a fluid such as water, oil, oil/water emulsion, gelled water, or gelled oil, is pumped down a well bore with sufficient pressure to open a fracture in the HC formation. The fluid may carry a suitable propping agent, such as sand, into the fracture for the purpose of holding the fracture open after the fracturing fluid has been recovered, e.g. allowing the well to flow. A normal fracture treatment consists of one continuous injection of fluid. In the case of tight, i.e. low permeability wells, i.e. below 1 md permeability, fracturing produces results that are of but a temporary nature as far as increasing rate of flow is concerned and little or no increase in total recovery is achieved. After perhaps a short period of accelerated flow, rate of production may drop off to near previous levels. Repeated stimulation with the same or similar procedure may again produce but a temporary gain.

Prior to the present invention, a conductive fracture extending radially one hundred fifty feet from the well bore was believed to be about the maximum obtainable.

The reason for the temporary increase in productivity produced by the prior art is believed to be that the fracture communicates the well bore with a small portion of the joint system between the matrix elements of the formation and with a small portion of the reservoir matrix. However, as soon as this low volume space has been drained, productivity drops off to that controlled by the low permeability reservoir matrix, and since the area exposed to such matrix by a short fracture is low, productivity is low.

Hydraulic fracturing procedure usually has best results in formations of moderate permeability, e.g. one to twenty millidarcies. In order to achieve satisfactory production from a formation of low permeability, e.g. below one millidarcy, it has been the belief of experts that a much longer fracture than that heretofore attainable is necessary.

SUMMARY OF THE INVENTION

According to the invention, significant prolonged increases in flow rate of several hundred percent above normal flow are attained and maintained. This is accomplished by employing one or more of the following procedures:

a. A single treatment including at least one double cycle of high pressure, low pressure, high pressure and low pressure.

b. A single treatment includes one double cycle, followed by a second double cycle.

c. A single treatment of two double cycles is followed by a third double cycle, et cetera.

Otherwise stated, according to the invention there are scheduled periods when injection is terminated and the well shut in or allowed to flow back to cause low fracture pressure to produce spalling, and there are plural periods of injection of fracturing fluid to move the spalls into propping position, to sandblast clear any fracture restrictions, and to sand out prior fractures in order to initiate secondary fractures transverse to the original.

In the case of an extremely thick section, e.g., in excess of fifty feet of uniform sand body, for the purpose of controlling loss of fracturing fluid to the formation, sand or other material of various sizes may be added to the fracturing material, and the vertical extent of the well bore treated thereby confined to the upper portion of the producing formation.

Further objects and advantages of the invention will become apparent from the further description appearing hereinafter.

BRIEF DESCRIPTION OF THE DRAWINGS

For a detailed description of preferred embodiments of the invention reference will be made to the following drawings wherein:

FIG. 1 is a plan view of a well site showing graphically the time of travel of a transient pressure wave front versus radial distance from the well bore, the well being a tight (low permeability) well and having been completed by conventional perforation without stimulation.

FIG. 2 is a similar plan view showing the results of conventional fracturing and of an improved form of fracture in accordance with one form of the present invention.

FIGS. 3 and 4 are diagrams illustrating possible reasons for failure of conventional hydraulic fracturing producing very long fractures;

FIGS. 5, 6 and 7 are schematic plan views of dendritic fracture systems in accordance with the invention;

FIG. 8 is a plan view similar to FIGS. 1 and 2 illustrating the transient wave front pattern utilizing the dendritic fracture system, esp. of FIGS. 6 and 7;

FIG. 9 is a plan view similar to FIG. 8 illustrating another aspect of the invention;

FIG. 10 is a schematic plan view of a stage in the process of creating the dendritic fracture system of the invention;

FIG. 11 is an isometric view of a thick sand provided in its upper portion with a dendritic fracture system in accordance with the invention;

FIG. 12 is a chart comparing well productivities; and

FIGS. 13, 14 and 15 are charts of well productivity.

DESCRIPTION OF PREFERRED EMBODIMENTS

A. Prior Art -- No Fracture

According to reservoir engineering theory, the time for a pressure disturbance, e.g., a pressure drop initiated by producing a well, to be propagated radially through an earth formation from the well bore, may be determined by the following equation:

t.sub.D = 40.phi.ucD.sup.2 /k (1)

where t.sub.D = diffusion time to radius D (days)

.phi. = porosity (fractional)

u = Reservoir fluid viscosity (centipoise)

c = Reservoir fluid (gas) compressibility in psi.sup.-.sup.1)

D = Distance to which the pressure disturbance has been propagated measured radially from the well bore (feet).

k = permeability (millidarcies)

Reservoir engineering theory and practice further indicate that the time T to drain the volume within the radius D of the well bore is given approximately by the equation:

T = 20 t.sub.D (2)

Twenty years is a desirable (economic maximum) drainage time for a well. If T=20 years, t.sub.D =20/20 = 1 year, or 365 days, so that at the end of one year the wave front will reach the distance D.sub.20 drained in twenty years. Therefore

D.sup.2 .sub.20 = 9.125k/.phi.uc (3)

From equation (3) one can calculate the area encompassed by radius D.sub.20. By using the area encompassed and the reservoir thickness, the volume of reservoir rock drainable in a 20 year period, the conventional period of the production life of a well for any particular type of formation, can be calculated.

Assuming that

.phi. = 0.1

u = 0.02 cps

c = 1/1500 psi

k = 0.03 md

one finds that

D.sub.20 = 450 feet.

In other words, for the pressure wave front to reach just a 450 foot radius or 14.6 acre area, in such a tight formation takes a whole year, and it takes twenty years to drain such a small volume. Similar calculations show that the pressure wave will take 21.5 years to reach the perimeter of a 320 acre square centered on the well bore and that the volume extending horizontally over such an area would be drainable in 430 years. The wave would take 34 years in the case of a 640 acre tract (one square mile) which would be drainable in 680 years. The foregoing is shown schematically in FIG. 1 wherein there is shown well bore 21 and 1, 24.5, and 34 year wave fronts, 23, 25, 27 and the perimeters 29, 31 of 320 and 640 acre tracts.

It will be apparent from the foregoing that in order to produce a field of such low permeability within a twenty year period the well spacing would have to be 900 feet, i.e., a well density of 43 wells per square mile. This shows the impracticality of economically producing a well in such tight formation without special productive techniques.

B. Conventional Short Fractures

Referring now to FIG. 2 there is shown schematically the situation existing in the case of a producing formation that has been processed in accordance with hydraulic fracturing techniques to create a single highly conductive fracture along line 33 extending from the well bore 21 in both directions. In this situation we are no longer dealing with radial propagation of the pressure wave nor radial flow. Because of the highly conductive fracture, it may be assumed that pressure throughout the fracture plane is substantially equal to that at the well bore. The pressure disturbance created in the formation by producing the well creates a pair of planar wave fronts parallel to the fracture plane. D is now the distance measured perpendicularly from the fracture and t.sub.D is the time for the wave front to reach distance D.

The other parameters are as before. The equation for t.sub.D is:

t.sub.D = 80.phi.(u)(c)(D).sup.2 /.sub.k (4)

If, as before, one assumes that the time T to drain a volume within a distance D from the fracture (including both sides of the fracture) is given by the equation:

T = 20t.sub.D (5)

then:

D.sup.2 = 4.5625k/.phi.uc (6)

Using the same parameters as before

D.sub.20 = 320 feet.

Let (L) be the length of the hydraulic fracture and A be the area of a horizontal section of the volume drained in twenty years. Then

A = (2)(320)(L)/43560 = 0.0147(L) acres. (7)

In the case of a conventional fracture of say 150 feet in each direction from the well bore, indicated on FIG. 2 by the line segment between points 34 and 35, the area drained would include the rectangular area computed as before

A = .0147(L)

or

A = .0147(300) = 4.41 acres

plus the two semi-circular end areas indicated at 37, 39 whose total area is 14.8 acres, for a total of 19.2 acres, corresponding to a density of 33.3 wells per square mile for 100% drainage. While this is better than the 43 wells per square mile for an unfractured well, it is probably non-commercial and is greatly inferior to the results achieved with long fractures made in accordance with the present invention.

C. Long Fractures

According to the present invention a long fracture is obtained by interrupting a conventional fracturing operation somewhere between the beginning and end of the injection period, preferably during the last 1/3 - 1/4 of the fluid injected. During the shut down period, that is, when the pumps are shut down and the flow rate and fluid friction of the injection fluid drops to zero, the pressure in the fracture is reduced to the sum of the hydrostatic head plus the surface instantaneous shut in pressure. The lowering of pressure at the fracture face causes the formation to spall at the fracture face. The spalls remain in place until flow is resumed by starting the pumps again. When flow is resumed, the spalls are displaced by the fluid and carried along a greater or lesser distance according to the size of the spall and the width of the fracture. These spalls will maintain the fracture propped open to nearly its maximum width, and at the same time the advancing pumped fluid will increase the fracture length.

If the fracture length is 3733 feet (the length of one side of a 320 acre tract).

A = 54.8 acres and if the fracture length is 5280 feet (the length of one side of a square mile tract),

A = 77.6 acres.

These are to be compared with the 15 acres drained without a fracture and the 19.2 acres with a conventional or short fracture.

With a long fracture as shown in FIG. 2 it would be practical to space wells with a density of 11.66 per square mile in the case of a fracture extending the length of a half square mile tract, and 5.7/square mile in the case of a one mile fracture. This of course would be much more economical than in the case of an unfractured well where the required density was 43 wells per square mile, or the case of wells with short fracture requiring 33.3 wells per square mile.

D. Recap: Short & Long Fractures

In order to obtain sustained high productivity from an oil or gas well, it is necessary to produce a relatively long, highly conductive fracture. The lower the permeability of the formation, the longer the fracture must be. However, as the fracture length increases there is a greater and greater chance that the conductive path can be altered so that not all of the generated length will remain connected to the well bore after the fracture fluid is recovered. Some of the reasons that the full length would not be utilized are illustrated in FIGS. 3 and 4.

Referring to FIG. 3 it is seen that a hydraulic fracture initially, that is, in the dynamic condition while the fracture is being formed, probably includes a plurality of relatively long straight fractures 41, 43, 45 joined by a plurality of short transverse fractures 47, 49 which interconnect the long fracture. In the static condition, the fracture consists of the same plurality of long fractures, 41, 43, 45, held open by the fracture sand to a limited degree, but the transverse fractures 47, 49 no longer interconnect the long fractures, the overlap of the long fracture at their ends disappearing as the fracture width diminishes, the transverse fractures shutting off the longitudinal fractures like valves.

Referring now to FIG. 4, it is seen that initially, that is, during fracture fluid injection, the walls 51, 53 of the fracture are held apart and the space therebetween is filled with fluid or sand laden fluid which is free to move. However after the fracturing operation has been completed, the spalls and related fines generated during fracturing will gradually fill the open spaces in the fracture. This will effectively shut off highly conductive channels when the well is put on production.

In order to insure that fluid flow is not shut off when the well is put on production either by the fracture closing at the intersection of joints or by the gradual blocking of the fracture by spalls and fines, the method of the invention, previously set forth briefly, is employed, as follows:

After an initial fracturing has occurred during the frac job, at calculated intervals, the pumps are shut down and the well is shut in or allowed to flow back to reduce the fluid pressure in the fracture to below the fluid pressure in the surrounding matrix of the formation. This reduction of fluid pressure in the fracture and flow of fluid from the matrix to the fracture causes earth stress next to the fracture to form spalls at the fracture face. The pumps are then started up again to regular fracturing rate with a corresponding increase in pressure. Fluid flow and pressure forces the face of the fracture apart and allows -- or forces -- the spalls to move out of their original position and be driven into the generated width of the fracture where they will remain supporting the earth forces that would tend to close the fracture when pumping ceases.

There will be a concomitant generation of "fines" (small particles of formation) generated when the spalls move. These fines will have a tendency to sand blast any great restriction in the fracture to keep it at maximum conductivity and in addition be swept out toward the end of the fracture where they will not be able to reduce fracture conductivity closer to the well bore.

It may or may not be necessary to use frac sand in the fluid to obtain desired results. If such sand is used, its primary function will be that of a fluid loss prevention system.

E. Historical Investigation

Analysis of data from fracturing reports relative to well treatments that have been performed in the past five years on a series of wells in the same formation in the same geographical area shows that a recent two months production of wells that had inadvertently been shut down because of mechanical failure of equipment during the frac job compared to wells that had not been shut down (i.e., had run according to frag plan) show a marked difference in production.

Twenty-one wells that had had a shut down period during fracturing on the particular months chosen averaged about $2018 gross production each.

Thirty-six wells that had been run according to plan without the shut down averaged $783 gross production each.

F. Experimental Test

A group of wells was then selected that used the same fracturing schedule as a previous group, but an intentional shut down period of one hour was put in the frac plan. This was done in the summer of 1972.

First month's production was about double compared to when no shut down period was used. It was then decided that more tests were required to determine if this increase in production would continue over a longer term.

When the shut down period was used, the wells would flow back treating fluid of about 1/2 the volume injected, approximately the same as with no shut down period.

The applicant then engaged in a period of systematic experimental tests lasting slightly over one year (until February 1974). During this period applicant experimentally treated approximately 40 wells, including both oil and gas wells. This program was carried out under strict secrecy agreements with both the well operators and the service companies that provided men and equipment to carry out the present invention's method of hydraulic fracturing. The agreements with the well operators provide that the operators must furnish the applicant with production information on treated wells, both before and after treatment, so the applicant will be able to assess the effects of the present invention. A production history of a year or longer is necessary to assess quantitatively the flow characteristics of a treated well. This is because most wells show an initial, short term (i.e. a few months), increase in productivity when they are treated by conventional fracturing methods. The fractures produced by conventional methods, however, tend to close up, as described above, and production declines sharply. An improvement taught by the present invention is the long term increase in productivity it accomplishes via dendritic fracturing of the formation. To determine quantitively if this desired result had been realized, an experimental period of a year or more is required.

Applicant performed experimental treatments while he was in the business of providing well treatment services of oil well operators. Experimental treatment of operating wells was necessary because the program of experimental tests required that a variety of formations be treated and that a substantial production history of each formation be available for comparison with production after treatment.

The following table sets forth a representive sample of the results obtained from the experimental tests conducted from January 1973 to July 1974.

    __________________________________________________________________________
    PRESENT INVENTION AND CONVENTIONAL FRACTURING METHODS
    COMPARED IN UNITED STATES PETROLEUM BASINS
                                        Typical           Thickness
    Example
         Basin/             Flow   Number
                                        Cost
                                            Sand Fluid
                                                     Depth
                                                          Gross
                                                               Net
    No.  State  Formation
                        Age Back
                               Fluid
                                   of Tests
                                        $   lbs. Bbls.
                                                     Ft.  Ft.  Ft.
    __________________________________________________________________________
    1    Appalachian
                Clinton Silurian
                            Some
                               W.  3    8,500
                                            37,000
                                                 3,000
                                                     5,000
                                                           50  30
         /Ohio
    2    Fort Worth
                Conglom-
                        Penn.
                            Some
                               E.       4,500
                                            52,000
                                                 1,500
                                                     4 to 10-30
                                                               2-20
         /Texas erate                                5,000
    3    Permian
                Canyon  Penn.
                            All
                               W.  2    12,000
                                            37,000
                                                 3,000
                                                     5,000+
                                                          30-50
                                                               30-50
         /Texas
    4    Uinta  Dakota  Cret.
                            All
                               W.  1    15,000
                                            37,000
                                                 3,000
                                                     9,400+
                                                           36  36
         /Utah
    5    Gulf Coast
                Wilcox  Cret.
                            All
                               E.  1    10,000
                                            37,000
                                                 1,500
                                                     8,000+
                                                           12   3
         /Texas                    1    11,000
                                            48,000
                                                 1,500
                                                     8,000+
                                                           20  15
    6    East Texas
                Hosston Cret.
                            No E.  1    24,000
                                            80,000
                                                 4,5000
                                                     8,000
                                                          50-
                                                               40-50
         /Texas Equiv.
                Travis Peak
    7    Denver-
                Muddy   Cret.
                            No E.  4    18,000
                                            150,000
                                                 4,500
                                                     7,000
                                                          50-60
                                                               20-40
         Julesberg
         /Colorado
    8    Carlsbad
                Morrow  Penn.
                            No.
                               E.  1    32,000
                                            150,000
                                                 4,500
                                                     11,000
                                                           --* --*
         Field/
         New Mexico
    9    Gulf Coast
                Austin  Cret.
                            All
                               W.  1    8,400
                                            150,000
                                                 9,000
                                                     2-3,000
                                                          200-600
                                                               200+
         /Texas Chalk
    __________________________________________________________________________
     *No Reservoir Discernible in Well Bore (well has offsetting production)


Average (dendritic fracturing) Approx. Conventional Present Invention Ex. K Formation Fracturing* Before After No. % md Temp. / Press. Lithology Mcf/D Mcf/D Mcf/D Remarks __________________________________________________________________________ 1 7-8 .002 110 12-1,300 ss 100-200 5-10 600+ 2 10-14 N.A. 110-20 16-1,800 ss & Lm 0-500 0-50 400-3,000 3 of 8 were 0-20 Bbl 20-80 Bbl refraced dry holes 10-12 .02-3 140 1,800 ss 600-1,000 0-300 2-3.5 M 4 12-18 .02-3 207 2,200+ ss Not economic 5 1,000 5 16-18 0.1-1 200 2,200 ss Variable- 300 at 800 psi 2.4M at 800psi 16-18 0.1-1 200 2,200 ss good to 1300 at 800psi 2.3M at 800psi uneconomic 6 8-10 .05-.1 250 2,500 ss Poor to Slight gas Water uneconomic 7 8-10 .02-3 250 1,800 ss Not economic Slight 1.5-2M 1 Bbl Water/MMcf -- -- 250 4,000 ss Unsatisfactory 0 0 Dry Hole Except for removal of well bore damage 9 18-22 .1 100 100-1,000 Ls 8 BOPD 3 BOPD 16 BOPD Refrac 6 BWPD 30-40 BWPD __________________________________________________________________________ *From well histories of similar formations after conventional fracturing. Applicant did not preform conventional fracturing on these jobs.


It will be noted that test No. 8 was a dry hole and that test No. 6 yielded water. However, in tests No. 1, 2, 3, 4, 5 and 9 the present invention yielded increases in production of from 200 to 500% over conventional fracturing processes.

In February of 1974 the inventor was able to conclude, as a result of the experimental program of well treatment, that the present invention significantly improved long term productivity of treated formations when judged against the results yielded by conventional fracturing methods. The process was then offered for sale to well operators. The applicant continued to execute confidentiality agreements with the operator to prevent any public disclosure of the invention.

G. Dendritic Fracture

Another well was selected. The same amount of fluid was used as before but three injection periods were used. At the start of the third injection period, even with higher pressure the injection rate was much lower. Then after a period of injection the pressure broken to a lower value and the rate of injection increased. No frac sand was used in this well. After the job was completed the well flowed back about 1/2 the treating fluid in the same manner that the others had. However, gas appeared at the surface during swabbing operations much sooner than previous wells. The pressure break along with the early gas production indicated a change in direction of the fracture, as will now explain.

It is applicant's belief that when the pumps are started the third time, fluid flow in the fracture causes the debris formed by crushing of the spalls formed during the first shut down period that moved during the second fluid injection period to move forward where they bridge against the chips or spalls that have just been formed by the second shut down. This causes a sandout at the end of the primary fracture. Pressure now increases until a new fracture starts at a weak point of the fracture wall. Since the rock is now under stress perpendicular to the fracture direction, a new or secondary fracture will propagate in a direction approximately perpendicular to the primary fracture. The result is a system of fractures as shown in FIG. 5, wherein 61 is the well bore, 63 is the initial or primary fracture, and 65 is the secondary or transverse fracture. To produce a long secondary fracture it will be necessary to proceed with the formation of this fracture wing in the same manner (i.e., two slugs of fluid with suitable shut down periods) as the primary fracture.

As noted in FIg. 5, the secondary fracture, probably, almost surely, will consist of only one wing. However, after completion of the first wing, if the pumps are started once more, there will be a movement of the debris in the single wing transverse fracture causing a sand out thereof and further pumping with suitable shut down periods will extend a fracture wing in the opposite direction from the first secondary wing as shown in FIGS. 7 and 8. The FIGS. 6 and 7 systems are the same as that of FIG. 5 except that in FIG. 6 a second wing 67 on the opposite side of the well from wing 65 has been added, and in FIG. 7 the second wing 69 is added on the same side of the well as the first wing 65. Such a system consisting of a primary fracture and one or more secondary transverse fractures may be called a dendritic fracture system. FIG. 5, then, shows a single wing dendritic system, and FIGS. 6 and 7 show double wing dendritic systems.

The pumping sequence would be like the following to produce the double dendritic fracture system:

pump, wait, pump, wait (primary), pump, wait, pump, wait (first secondary), pump, wait, pump, shut down end (second secondary).

The reason why the dendritic system, which is produced by the above described pumping cycle in accordance with the invention, causes a different, and as will appear, vastly improved well productivity, will next be considered.

Referring now to FIG. 8, there is shown a well bore 21 from which extend a primary fracture 73 and a pair of transverse fractures 75, 77, the latter being shown as collinear in view of the scale of the drawing, it being assumed that they will both be close to the well bore. The pressure waves from the fracture will move out as indicated by the four chevron wave fronts, 79, 81, 83, 85. Subsequent positions of these same wave fronts are shown at 79', 81', 83', 85'.

The four chevron wave fronts shown in FIG. 8 may be treated as eight linear wave fronts, the two linear wave fronts of each chevron front overlapping in their propagation. For each of the eight linear fronts, reservoir engineering theory shows that

t.sub.D = .sqroot. 40 .phi.ucD.sup.2 /.sub.k (7)

and remembering from equation (2) that T = 20t.sub.D so that for T=20 years, t.sub.D =1 year, we find that the distance D drained by each of the eight waves in twenty years is

D.sub.20.sup.2 = 57.7 k/.phi.uc (8) From equation (7) one finds that for the formation having the same constants as previously considered in the case of unfractured and conventionally fractured wells, the distance to which the formation is drained in twenty years by each of the eight linear fronts is 1140 feet.

Assuming as in the case of a long linear fracture previously described that the primary fracture is 3733 feet (the length of one side of a 320 acre or half square mile tract) and that the two wings of the transverse fracture total 3733 feet, the area drained by the dendritic fracture system is 272 acres. This is readily computed as the area of the square of 3733 feet on a side less the area of the four squares not drained by any of the eight linear wave fronts. The equation is

A = 320 - 4(1866 -D.sub.20).sup.2 /43560 (10)

where D.sub.20 as before is the distance drained in twenty years by each of the eight linear wave fronts. The foregoing 272 acres drained by the dendritic fracture system is to be compared with the 54.8 acres drained by a single long hydraulic fracture 3732 feet) in accordance with the invention and the 19 acres drained by a conventional 300 foot linear fracture and the 14.6 acres drainable in 20 years without any fracturing at all.

H. Comparison of Drainage

A comparison of the several fracture systems that gives a further insight into their differences is obtained with reference to the shape of the maximum equal pressure surfaces under steady state conditions of a field of several adjacent wells in which the well spacing is so related to the productivity that the wave fronts reach a maximum distance from the well and then cease to propagate further due to interference from waves from adjacent wells. In the case of unfractured wells, the cylindrical (circular horizontal section) waves from the several wells may ultimately meet and thereafter the maximum equal pressure surfaces may be considered to be overlapping cylindrical surfaces. In the case of linear hydraulic fracturing, parallel wave fronts from adjacent wells may meet and thereafter the maximum equal pressure surfaces are fixed planes (lines in horizontal sections) between the wells. But in the case of dendritic fracturing, the chevron wave fronts from adjacent wells overlap and meet a single vertical line (point in a horizontal section).

I. Natural Joint Systems

A very important advantage of the dendritic system over any linear fracture system results in the enhancement obtained from natural joint systems.

Consider a tight, well consolidated formation. In geologic time it will have developed a joint system that consists of cracks that are more or less cemented that trend in a general direction. The cement in the cracks is probably not as strong as the rock matrix. In addition, the cracks probably have more fluid transmissibility than the rock matrix. There will also be a secondary joint system more or less perpendicular to the major joint system. These are also planes of weakness.

Referring now to FIG. 9, there is shown a schematic diagram similar to FIGS. 1, 2, and 8, showing a plan view of a well bore 21 relative to 320 and 640 acre squares. When a fracturing process as described herein is carried out, the primary fracture 86 probably follows one of the major joints 87. When the secondary fracture system is developed, it will intersect many joints of the major joint system. In addition to the foregoing explanation, the transmissibility of all the joints cut will further aid in rapid recovery of reservoir fluids. The relatively short arrival times for the pressure wave fronts at the 320 and 640 acre perimeters in the case of several assumed permeabilities of the natural joints in millidarcies is charted in the upper left hand quadrant of FIG. 9 such times being calculated as before.

J. Use of Sand: Fluid Loss Control

Depending on the strength of the reservoir rock and the configuration desired for the fracture system, it may or may not be necessary to use a propping agent. In the case of strong rock, self propping is achieved. However, fine sand may be useful for fluids loss control, the fine sand blocking frac fluid from entering into the transected joints. This is illustrated in FIG. 10 whereat is shown well bore 91, primary fracture 93, secondary fracture 95, and joints 97, 99 the latter being blocked off with sand as shown in 101, 103.

There are several reasons to keep the amount of fracturing fluid to a minimum, especially in gas wells. Among these are the actual cost of the fluid and injecting the fluid along with the cost of propping agent. In addition, the well must produce back the fluid injected before it can reach its best potential.

In the dendritic fracturing techniques that have been described hereinabove stimulation is at least partially achieved by utilizing natural joint systems in the reservoir. In massive formations, these joint systems probably extend vertically as well as horizontally throughout the reservoir; (see page 87 of the article entitled "Reservoirs in Fractured Rock", SUPRA.).

The fracture formed in the producing formation may be confined to the upper portion of the producing formation where lithology (overlying rock) will limit the upward growth of the fracture and sand properly scheduled will limit the downward growth of the fracture. When a dendritic fracture system is formed, the joints are intersected that will connect the reservoir both laterally as well as vertically to the fracture system and thus to the well bore. If the vertical extent of the fracture system is limited, as much as 80-90% of the fluid that would be required normally could be saved.

The foregoing method of limiting the height of the fracture system is illustrated in FIG. 11, wherein a portion of the producing formation is shown in 111. From the well bore 113 extends the primary fracture 115, extending parallel to or along a natural joint, and secondary fractures, 117, 119 extending transverse thereto. Extending transverse to the natural joints such as 121 are natural transverse joints such as 123. It is these natural transverse joints which are blocked initially by the frac sand to limit loss of frac fluid during the second and third cycles of the fracturing method of the invention. As is apparent from FIG. 10, the frac sand not only blocks too extensive horizontal travel of frac fluid along the natural transverse joints but also limits downward travel of the frac fluid along the primary fracture, the secondary fracture, and the natural primary and secondary joints.

K. Further Historical Comparison

FIG. 12 is a chart prepared from an examination of the frac reports on a group of wells all in the same formation and all in the same general geographical area and all in what is believed to be a very tight formation. The wells were developed as near as the analyst could do so into two groups. In one group were wells wherein for some reason, e.g. mechanical break down of pumping equipment the fracturing procedure was interrupted; in the other group there was no substantial interruption. The productivity of all of the wells was checked from the monthly reports. It appeared that wells wherein the frac process had been interrupted were in many cases of higher productivity than those wherein the frac process was uninterrupted. Averages for the prouctivity of numbers of wells in the group treated by various types of frac treatment are shown in FIG. 12. This is not to imply that in every case the wells with interrupted fracturing produced better than wells similarly treated except for lack of interruption although this may be the case. Also, this is not to imply that such results will be found in the case of groups of wells or individual wells in other areas, although this also may be the case, at least in many instances. It is further to be observed that greater increase in productivity was obtained with interrupted fracturing in the case of visofrac (viscous oil fracturing), and F.W. (fresh water) emulsion and S.W. (sale water) emulsion than in the cases of gelled F.W. and S.W. fracturing; this being due it is believed to the higher viscosity of the oil and emulsion fracturing fluid compound to the gelled water, the higher viscosity resulting in higher fracturing pressures and widths, the greater fracture width allowing more opportunity for spalling when pumping ceases, thereby to obtain the advantages of the invention on resumed pumping as previously explained.

The invention has also been applied but without success to a single offset from three producing gas wells; the result was a substantial dry hole. This is believed to be due to the fact that the fracture did not contact any gas bearing reservoir.

L. Apparatus

The methods of the invention can be carried out by any of the known apparatus used for previously known methods of hydraulic fracturing. A suitable apparatus is shown and described in my aforementioned United States Pat. No. 3,722,595 issued Mar. 27, 1973, the disclosure of which is incorporated herein by reference. My United States Pat. No. 3,378,074 issued Apr. 16, 1968 also shows suitable apparatus and its disclosure is also incorporated herein by reference (the line 39, pump 40 and line 41 may be omitted). The fracturing fluid can be injected through the well tubing, casing, or other available or suitable pipe or conduit and may be flowed back into a pit or into the fracturing fluid tanks. The fluid can be injected through perforations in the tubing or casing extending through the pipe and surrounding outer pipe and/or bore hole annulus cement or directly into the formation, the injection being confined vertically by virtue of the location of the perforations, the pipe, the cement, and the formation above and below the perforation hole. Vertical extends of well pipe of one foot or less to one hundred feet or more are contemplated with respect to injection of fracturing fluid. The pumps used in carrying out the method will normally be positive displacement pumps, with diesel engines or gas turbine device. Shutting down the engine or turbine will hold the pumps stationary and thereby holds back pressure in the well. Reverse flow is normally accomplished through a 2 or 3 inch full opening valve. In an example hereinafter set forth ISIP stands for Instantaneous Shut In Pressure and is the surface pressure existing at zero injection rate.

M. Parameters

i. Fracture Fluid

The fracture fluid preferably used in carrying out the method of the present invention desirably is such as to cause little pressure drop in the pipe, maximum pressure in the formation, minimum total fluid loss to the formation, minimum rate of fluid loss to the formation, high carrying capacity for sand or other propping agent with respect to both ratio of sand volume carried to volume of fracture fluid and also distance and time carried, and high and rapid retrieval of fracture fluid when the well is put on production. The fracturing fluid will be substantially uncompressible. To a certain extent, some of these factors are related to viscosity, but high viscosity is effective to achieve some results but low viscosity is effective for other purposes. Fluids of time variant viscosity may therefore be used. The viscosity of the injection fluid may range from 30 centipoise or less up to 100 centipoise or more at reservoir temperature. Other factors to be considered include the physical characteristics of the fluid; the fluid is a liquid or gel or emulsion, not usually pure gel. Preferably, the fluids such as those known to the trade as Super Frac and Super Emulsifrac are used. These are described in U.S. Pat. Nos. 3,710,865 - Kiel (emulsion) and U.S. Pat. No. 3,378,075 - Kiel (heavy oil), the disclosure of which are incorporated herein by reference. The Super Emulsifrac fluid is the better of these, especially for gas wells. It is to be observed that in fracturing with water, gelled water, light crude oil, gelled light crude oil, and the like, the pressure ordinarily decreases during the frac job. With the preferred fluids for the present invention, pressure ordinarily increases during the job even when injection rate remains constant. It is to be noted, of course, that pressure drop occurs both in the pipe and the formation; every effort is made to reduce the pressure drop in the pipe and to increase the formation pressure drop up to a point. Therefore fracturing fluids preferred in accordance with the invention may be characterized as formation pressure increasing fluids. It may be surmised that with such fluids, the formation matrix permeability may be temporarily decreased as fluid is injected, thereby causing the formation pressure drop to rise. The effect is to reduce fluid loss, thereby making it practical to have shut down periods in the course of a treatment. In the present invention it is necessary to use a fracturing fluid capable of undergoing limited fluid loss to the formation. The fluid must be capable of permeating the formation matrix as a precurser to spalling when pressure in the fracture is reduced, but the preferred fluid's loss to the joint system of the formation will be as small as possible. In conventional fracturing, when sufficient fluid loss occurs, injecting additional sand blocks the fracture at the well bore causing a sand out. In accordance with the invention, such well sand outs are not to occur.

ii. Pressure

In carrying out the methods of the invention, pressures of 1,000 psi or less up to 15,000 psi or more may be employed, usually about 5,000 psi, the resultant fracture pressure depending on the pump pressure and the well depth and the pressure drops in the pipe and through the fracture.

iii. Injection Time

The injection time depends on the volume of fracturing fluid to be injected, which is determined by how big a fracture is desired and is calculated in advance, and upon the flow rate, which depends on the pressure and flow resistance. The minimum injection time preferably is on the order of several minutes. The time for the entire treatment typically may be one hour or less to eight hours or more.

The total injection time will be the sum of the injection times of the several double cycles, that is, the times for the double cycles for each fracture configuration, primary, first transverse, and second transverse. The injection time for each double cycle will be the sum of an initial or first injection time and a following or second injection time. There will be intra-configuration shut down periods between the first an second injections of each double cycle, and there will be inter-configuration shut down periods between each double cycle.

iv. Injection Volume

The division of injection volumes between the several double cycles may be varied. Absent consideration of any distinctions between the several fracture configurations and other factors, one might divide the volume equally between the several double cycles, e.g. 1/3 of the total volume to each double cycle in the case of three double cycles. To take into account fluid loss, one might assume that the total fluid lost is a linear function of the square root of time. On this assumption, it is presently the practice to divide injection volumes between three double cycles in the approximate proportions 10/14/18. However this may change in the light of future experience.

The division of injection volumes between the first injection and second injection of each double cycle may be such that the volume injected during the second injection is about 1/4 to 1/3 that injected during the first injection. This is arrived at by considering that it is desirable for the injection pressure during the second injection to rise the same amount above the initial injection pressure during the second cycle as the amount of rise above the initial injection pressure of the first injection that occurred during the first injection cycle.

The total volume of fluid injected may be from 3,000 barrels or less up to 20,000 barrels (42 gallon barrels) or more, preferably three thousand to five thousand barrels.

Since injection times are a function of injection volume, injection times for the several double cycles may also be in the ratio of 10/14/18, and the second injection of each double cycle may take 1/4 to 1/3 the time of the first injection. Hence the shortest injection period should be, for example, 60 .times. 10/42 .times. 1/4 =3.6 minutes, which is on the order of several minutes.

v. Shut Down Time

In determining shut down time, one may make reference to the time required for decrease in shut in pressure. Time for both the intra-configuration and inter-configuration shut down periods has arbitrarily been selected to be such that surface pressure will not decrease more than 1/3 of the amount it increased during the pumping operation. Although shut down time has varied from five minutes or less to an hour or more, five minutes seems to be long enough for spalling to take place. Thus low pressure periods on the order of several minutes appear adequate to practice the present invention.

In accordance with the invention, the well is not commercially produced between injections; this distinguishes the method from simple retreatment of a well and from a double cycle occurring accidentally due to mechanical breakdown in the course of a conventional treatment. Also, in accordance with the invention, the discontinuance of fluid injection in the course of the double cycle is intentional, which further distinguishes such a double cycle from that occuring accidentally due to mechanical breakdown. The period of injection interruption will, of course, normally be much less than the period of commercial production of a well between repeated conventional treatments, which period would be a matter of months or years. The interruption of injection occuring during a double cycle according to the invention may therefore be characterized as scheduled and brief, thereby to distinguish it from accidental interruptions and from the case of retreatment after commercial production.

N. Examples:

EXAMPLE I

The following is an example of an experimental well stimulation treatment carried out in April of 1973 according to the invention. Permission to publish this information has been obtained. Formation Thickness: 30' Depth: 7896' to 7926' Materials: Frac Fluid: Super Emulsifrac (which is an oil water emulsion consisting of 1 part of fresh water and 2 parts of lease condensate or other light hydrocarbon) Propping Agent: Sand, 100 mesh, 150,000 lb. 20/40 mesh, 50,000 lb. * NE (normal emulsifying) agent type: SEM- 5 which is quaternary compound, 486 gallons * Gelling Agent Type: WG-6, which is Guar Gum, 3,000 gallons pH buffer Type: CW-1, which is monosodium phosphate, 800 pounds Casing: New, 41/2" O.D., from 0' to 8015', weight 10.5 lb. per foot, maximum psi allowable 4,000. Perforations: 1/2" diameter, from 7896' to 7926' one shot per foot Displacement pressure: 2400 psi Breakdown pressure: 2550 psi Maximum pressure: 4100 psi Final Shut In: Instant Pressure: 1800 5 minutes 1850 15 minutes Hydraulic Horsepower: Ordered 3000 Available 3000 Used 2034 Average Rates in Barrels Per Minute: Treating 21 Displacement 21 Overall 21 Volumes: PAD Gal 126,000 Treatment Gal 48,000 Displacement Gal 6,000 Total Vol. Gal 189,000

                    Volume  (GAL)
    Event  Time Rate
                    (INCREMENTAL
                            Pumps
                                 Pressure (psi)
                                           Description of Operation
    No.         (bpm)
                    VOLUME) C    (Casing)  and Materials
    __________________________________________________________________________
                                           Safety Meeting - Discuss
                                           Procedure
                                           With All Concerned.
        1  1018 26  20,000  6      0       Start Pad - Load Hole
        2  1025  4  P       1    5000      Test Lines
        3  1031  4  A       1    2550      Breakdown
                    D
        4  1048 24  4,000   4    3900      Start No.4 No. 1 Sand
        5  1053 24  2,000   4    3800      Start Pad
        6  1054 24          4    3800      No.4 No. 1 On Formation
        7  1055 24  4,000   4    3800      Start No.4 No. 1 Sand
        8  1058 24          4    4000      Pad On Formation
        9  1059 21  2,000   4    4000      Start Pad
       10  1101 24          4    3950      No.4 No. 1 On Formation
       11  1101 24  4,000   4    3950      Start No.4 No. 1 Sand
       12  1105 18          4    3975      Start Flush
       13  1106 21  6,000   4    3975      Start Flush
       14  1107 26          4    3950      No.4 No. 1 On Formation
    ** 15  1113                            ISIP 2200 - 5 Min. 2000 - 15 Min.
                                           1800
       17  1127 24          4    4000      Start Pad
       18  1136 24  4,000   4    4000      Start No. 4 20/40 Sand
       19  1141 21  6,000   4    3700      Start Flush
       20  1142 26          4    3400      No.4 20/40 On Formation
       21  1147 24          4    3900      Shut down
    ** 22  1147                            ISIP 2250 - 5 min. 2100 - 15 Min.
                                           1900
       23  1202 26  20,000  4    3800      Start Pad
       24  1223 21          4    4000      Start No.4 No. 1 Sand
       25  1228 21  2,000   4    3900      Start Pad
       26  1230 26          4    3700      No.4 No. 1 On Formation
       27  1230+
                21  4,000   4    3750      Start No.4 No. 1 Sand
       28  1234 17          4    4000      Pad on Formation
       29  1235 24  2,000   4    4000      Start Pad
       30  1237 24          4    4000      No.4 No. 1 on Formation
       31  1239 18  4,000   4    4000      Start No.4 No. 1 Sand
       32  1241 181/2       4    4000      Pad On Formation
       33  1243 24  6,000   4    4000      Start Flush
       34  1244 27          4    4000      No.4 No. 1 On Formation
       35  1249 22          4    4000      Shut Down
    ** 36  1249                            ISIP 2400 - 5 Min. 2200 - 15 Min.
                                           2100
       37  1306 25  8,000   4    4000      Start Pad
       38  1313 20  4,000   4    4000      Start No.4 20/40 Sand
       39  1319 23  6,000   4    3800      Start Flush
       40  1320 26          4    3600      No.4 20/40 On Formation
       41  1325 231/2       4    4000      Shut Down
       42                                  ISIP 2450 - 5 Min. 2300 - 15 Min.
                                           2200
       43  1340 24  20,000  4    4000      Start Pad
       44  1402 20  4,000   4    4000      Start No.4 No. 1 Sand
       45  1408 27  2,000   4    3800      Start Pad
       46  1410 24          4    3800      No.4 No. 1 On Formation
       47  1410 24  4,000   4    3800      Start No.4 No. 1 Sand
       48  1414 19          4    3900      Pad On Formation
       49  1415 24  2,000   4    3800      Start Pad
       50  1415 24  2,000   4    3800      No.4 No. 1 On Formation
       51  14171/2
                24  4,000   4    3800      Start No.4 No. 1 Sand
       52  1422 18          4    3900      Pad on Formation
       53  1423 24  6,000   4    3900      Start Flush
       54  1424 21  6,000   4    3800      No.4 No. 1 On Formation
    ** 55  1429 191/2       4    3900      Shut Down
       56                                  ISIP 2800 - 5 Min. 2300 - 15 Min.
                                           2300
       57  1444 18  8,000   4    4000      Start Pad
       58  1456 12  4,000   4    4000      Start 4lbs. 20/40 Sand
       59  1502 18  6,000   4    3600      Start Flush
       60  1504 24          4    3400      No.4 20/40 On Formation
       61  1512 12          4    2500      Finish
                                           ISIP 1800 30 Min.
    __________________________________________________________________________
                                           1700


In connection with the foregoing example, attention is directed to each of the instantanious shut in pressures occurring during the treatment. At event No. 15 the ISIP is 2200 psi, which is normal for the particular area after a conventional treatment. At event No. 22 the ISIP is still only 2250 psi, reflecting greater width in the initial fracture, which has now a much larger connected length but still is only a single fracture. At event No. 36, the ISIP is 2400 psi, indicating a change in fraction direction as previously explained. At event No; 42, the ISIP is 2450 psi, indicating increased fracture width but no new fracture wing. At event NO; 35 the ISIP is 2800 psi, indicative of a new fracture wing. The final ISIP of 1800 at the end of the treatment is with flush water in the hole instead of emulsion; the water being much denser than the emulsion, surface pressure is lower.

EXAMPLE II

The following is another example of an experimental well stimulation treatment carried out in Feb. 11, 1973 in accordance with the invention, the injection being through the tubing. The formation treated is known as the Muddy J. Sand. Permission to publish the information has been obtained.

Allowable Pressure: Tubing 4600 psi Casing 1000 psi

Job Done Down Tubing.

Gas Well

New Well

41/2 inch diameter casing.

21/2 inch HD tubing.

Tubing Depth: 2230 feet

Baker packer.

Packer depth: 2230 feet

Casing Volume Below Packer: 100 .+-. barrels

Tubing Volume: 15 .+-. barrels

Perforated Intervals: Depth 8083-8117 feet Number of Holes 34

Fluid: Superfrac K-1

Maximum Pressure: 4600 psi

Average Pressure: 4500 psi

Final pump in pressure: 3900

Adjusted Injection Rate (solids included) 18 barrels/min.

Total Fluid Pumped: Oil 2365 barrels Water 1335 barrels

(Note: 24 barrels equal 1000 gallons)

Props and Liquids Injected: 100 mesh sand, 144000 lb. 20/40 mesh sand, 48000 lb.

    INJECTION      PRESSURE
    Time  Rate
             Bbls In
                   Csg.
                       Tbg.
                           SERVICE LOT
    __________________________________________________________________________
                           Hook up -- Mix chemicals.
                           Hook up to well.
    12:00                  Suspend operations -- Not enough
                            time for job completion
    6:00  2-22-73          Resume operations -- Complete
                            hook up. Hold safety
                            meeting & discuss procedures.
                           Test connections--Repair leaks--
                            Load & press. csg.
    8:30           1000    Start K-1 Pad
              86   1000
                       1500
                           Hole loaded--breakdown.
    11             1000
                       1800
                           Ftm. feeding--Improve rate
                            & press.
    22             1000
                       4600
                           Adjust rates in observance of
                            max. press.
    19        480  1000
                       4600
                           Start 100 mesh sand 4lbs./gal.
    22        592  1000
                       4200
                           Stop sand--start K-1 spacer.
    19        640  1000
                       4400
                           Resume sand at 4lbs./gal.
    21        752  1000
                       4100
                           Stop sand--start K-1 spacer.
    19        800  1000
                       4300
                           Resume sand at 4lbs./gal.
    16        912  1000
                       4500
                           Stop sand -- start K-1 flush.
    18       1027  1000
                       4400
                           Flush comp. -- S.D. --
                            Observe press.
                   1000
                       2200
                           ISIP
                   1000
                       1950
                           14 Min. S.D. -- Start K-1 pad
                            --Stage II
    18             1000
                       4200
                           Rate & Press. Check.
    17       1219  1000
                       4500
                           Start 20-40 Sand 4lbs./gal.
    20             1000
                       3900
                           Rate & Press. Check.
    19       1329  1000
                       4300
                           Stop sand -- Start K-1 Flush.
    16       1446  1000
                       4400
                           Flush Comp.--S.D.--Observe press.
                   1000
                       2200
                           ISIP
                   1000
                       1950
                           18 min. S.D.--Start K-1 Pad--
                            Stage III
    19             1000
                       4500
                           Rate & Press. Check.
    19       1926  1000
                       4200
                           Start 100 mesh sand 4lbs./gal.
    15       2040  1000
                       4600
                           Stop sand -- Start K-1 spacer.
    16       2088  1000
                       4400
                           Resume sand at 4lbs./gal.
    16       2198  1000
                       4300
                           Stop sand--Start K-1 spacer.
    17       2246  1000
                       4500
                           Resume sand at 4lbs./gal.
    19       2356  1000
                       4000
                           Stop sand -- Start K-1 flush.
    18       2471  1000
                       4300
                           Flush comp. -- S.D.-- Observe
                            press.
                   1000    7 min. S.D. -- Start K-1 pad--
                            Stage IV
    16             1000
                       4400
                           Rate & press. check.
    18       2663  1000
                       4600
                           Start 20-40 sand 4lbs./gal.
    18       2773  1000
                       4600
                           Stop sand -- Start K-1 flush.
    18       2888  1000
                       4500
                           Flush comp. -- S.D. -- Observe
                            press.
                   1000
                       2350
                           ISIP
                   1000
                       2250
                           9 min. S.D.-- Start K-1 pad--
                            Stage V
                   1000
                       4600
                           Press. & rate check.
    18       3368  1000
                       4500
                           Start 100 mesh sand 4lbs./gal.
    20       3478  1000
                       4100
                           Stop sand--Start K-1 spacer.
    20       3526  1000
                       4320
                           Resume sand at 4lbs./gal.
    18       3636  1000
                       4600
                           Stop sand -- Start K-1 spacer.
    20       3684  1000
                       4100
                           Resume speed at 4lbs./gal.
    16       3794  1000
                       4500
                           Stop sand -- Start K-1 flush.
    19       3909  1000
                       4600
                           Flush comp.-- S.D.--Observe press.
                   1000
               

Next ten patents ordered by date:
Translate:
En
De
Es
Fr
It
Pt
Ja
Ko
Zh 

 

Title: Hydraulic fracturing process using reverse flow

Doc Type:
Abstract: Well productivity is increased by multiple hydraulic fracturing cycles. A double cycle first creates a long primary fracture by fluid injection and forms spalls by subsequently allowing the pressure in the fracture to drop below the initial fracturing pressure by discontinuing injection and shutting the well in or allowing it to flow back, resuming injection to displace said spalls longitudinally in said fracture and again discontinuing injection, whereupon the fracture is propped open by the displaced spalls. Multiple applications of this double cycle successively create transversely directed secondary long fractures. Fracture extension and fluid loss is controlled by the sandout of fine spalls at terminal ends of the fractures, supplemented when necessary by the injection of sand of selected size to filter pack the natural joint system and, in some instances, to filter pack the vertical downward extent of joints and fractures thus limiting further fractures to the upper portion of the producing formation where upward leakage is inhibited by the overburden.


Do you think this is a good invention? Vote now:

 Votes so far: For:(0) Against:(0)

Inventors: Kiel, Othar Meade

Application Number: 544411
Filing Date: 1975-01-27
Publication_date: 1976-01-20
Assignee:
Primary Class(es): 166/308.1 166/281, 166/283
Other Classes:
US Patent Ref:
2769497Nov, 1956Reistl, Jr.166/308.
2915122Dec, 1959Hulse166/249.
3048226Aug, 1962Smith166/177.
3189092Jun, 1965Bodine166/249.
3245470Apr, 1966Henry166/280.
3302720Feb, 1967Brandon166/249.
3378074Apr, 1968Kiel166/308.
3592266Jul, 1971Tinsley166/308.
3710865Jan, 1973Kiel166/308.
3722595Mar, 1973Kiel166/308.
3743017Jul, 1973Fast et al.166/308.

Other Refs: Other References: stearns et al., "Reservoirs in Fractured Rock," AAPG Memoir No. 16, Stratigraphic Oil & Gas Classification Methods and Case Histories, 1972, pp. 82-106.